CKY Interlocking Blocks (Industrialised Building System or IBS), the Breakthrough In Masory Construction is a better patented building product for all building works that provides homes and buildings with a cooler and quieter environment. To all contractors, developers, house owners and government bodies, this is the alternative answer to all who are looking for inexpensive, less labour intensive and faster project completion. We are the solution provider to make your vision come true.
Block Specification
Technical Advantages
Financial Advantages
Product Applicatiion
Steps Involved When Using CKY Interlocking Blocks
When you have decided to use CKY Interlocking Block for your project, you need to decide the dimension of the building that you intended to built on your land and compound. Get the Architect or your self to draw out the plan based on the modular dimension of 200mm x200mm. If you are unable to draw the required drawings, Call CKY Interlocking Blocks representative to assist you. |
![]() |
Order the correct numbers and types of blocks, door frame and piping based on the drawing of your building. |
![]() |
Cast the foundation based on the design drawings by your engineer. While casting the foundation and floor slab ensure the finishing floor level is level. The level variation should not exceed 25mm in height. Proper leveling control is highly recommended to avoid cutting the 1st layer of block to match the uneven finished floor level. |
![]() |
When casting the floor slab and footing. Make sure all starter bars are placed in the right location according to the design plan. |
![]() |
Check and ensure all underground piping and opening are provided before casting the floor slab. |
![]() |
Wait for caste concrete floor harden for at least 3 days before laying blocks on slab. |
|
Setting out blocks location according to plan. Check the position of rebar position. If wrongly placed bar rectify before proceeding with laying the 1st course |
![]() |
Check and endure delivery of blocks required and door frame delivered at site. |
|
Before laying the 1st course of blocks, Survey floor level where blocks are going to be laid. Study the levels variance. Take the highest level as the 1st course starting level. If level variance is greater then 30mm, then adopt the level that has the maximum of 30mm in height. For levels that are in exceed of 30mm. cut the affected blocks height to suit the floor level. It is recommended to cut the blocks with diamond cutter. |
![]() |
Mix cement and sand mortar according to specification for the leveling 1st course of block. When laying 1st course, start at the corner and progressively lay to the other end of the building. Complete the laying in that manner. Fix door frame before continue upper blocks. When completed the 1st course. Wait for 24 hours before continue laying the upper blocks. |
![]() |
When resume laying 2nd course onwards, mix the mortar adhesive according to manufacture instruction. Place adhesive in groove to receive the tongue of upper blocks. Repeat the laying blocks in layer until all required blocks lay. |
![]() |
Lay blocks up to 7th courses or half of the wall height. Then place Rebar at column and stiffener area. Concrete the required areas before proceeding upper floor. |
![]() |
Continue the block laying until reach the bond beam level. Place rebar and concrete the bond beam. Note: If roof trusses is to sit on the bond beam. Make sure all holding down bar is in correct position. |
![]() |