Cost Comparison

 

 
COST COMPARISON FOR (10ft x 10ft)
100 SQ FT OF INFILL WALL (41/2')
BOTH SIDES PLASTERED
CKYIBS

CKYIBS

Blocks

Cement

Sand Bricks

COST COMPARISON FOR
(10ft x 10ft)
100 SQ FT OF INFILL WALL (41/2')
BOTH SIDES PLASTERED

Cement Sand Bricks

1 Materials 6"x8"x16" 3"x41/2"x9" Materials
    RM RM  
  Blocks 113 pcs @ RM 2.70 ( klang valley ) 305.10 80.00 Cement Sand Bricks 500 pcs @ RM 0.16
         
  Block wastage 1% 3.05 3.20 Wastage 4%
         
2 Masonary labour cost     Masonary labour cost
         
  Labour @ RM 0.5 x 113 ps 56.50 80.00 Labour @ RM 0.16 x 500 ps
  Mortar for First course 5.00 25.00 Mortar Cost @ RM 0.25 /ft2 x 100
  Block adhesive @ Rm .10 per block 11.30    
3 Stiffener /Tie beam     Stiffener /Tie beam Formwork
  No formwork needed included in   2.60 Stiffener (100mm x100mm) 1.3 sf @2.0 /sf
  Beam and column block   36.00 Tie beam (150mm x 200mm) 18 sf @2.0/sf
         
         
5 Re-Bar @ 2.70 per kg     Re bar for stiffener & Tie beam @ 2.7per kg
  Column 1Y12 7.70 28.00 Stiffener 4R10 /Link R6@150MM/CC
  Bond beam 2Y12 Link R6 @ 200MMCC 17.42 35.80 Beam 4R10 /Link R6@150mm/CC
         
  Skim coat RM 0.45 /fs x 200 90.00 200.00 Cement sand 20mm plaster RM 1.00 x 200
         
         
7 Concrete infill to beam and Column @ 190/M3     Beam & Column concrete @190.00 per M3
  Column 3.05 6.10  
  Beam 5.13 18.25  
         
         
  Total 504.25 514.95  
         
  Cost Saving Per 100 sf wall 10.70    

 

 

COST COMPARISON FOR
(10ft x 10ft)

100 SQ FT OF INFILL WALL (41/2')

BOTH SIDES PLASTERED CKYIBS

CKYIBS

Blocks

Clay

Bricks

COST COMPARISON FOR
(10ft x 10ft)
100 SQ FT OF INFILL WALL (41/2')
BOTH SIDES PLASTERED
For Clay Bricks
1 Materials 6"x8"x16" 3"x41/2"x9" Materials
    RM RM  
  Blocks 113 pcs @ RM 2.70 ( klang valley) 305.10 130.00 Clay Bricks 500 pcs @ RM 0.26
         
  Block wastage 1% 3.05 5.20 Wastage 4%
         
2 Masonary labour cost     Masonary labour cost
         
  Labour @ RM 0.5 x 113 ps 56.50 80.00 Labour @ RM 0.16 x 500 ps
  Mortar for First course 5.00 25.00 Mortar Cost @ RM 0.25 /ft2 x 100
  Block adhesive @ Rm .10 per block 11.30    
3 Stiffener /Tie beam     Stiffener /Tie beam Formwork
  No formwork needed included in   2.60 Stiffener (100mm x100mm) 1.3 sf @2.0 /sf
  Beam and column block   36.00 Tie beam (150mm x 200mm) 18 sf @2.0/sf
         
4 Re-Bar @ 2.70 per kg     Re bar for stiffener & Tie beam @ 2.7per kg
  Column 1Y12 7.70 28.00 Stiffener 4R10 /Link R6@150MM/CC
  Bond beam 2Y12 Link R6 @ 200MMCC 17.42 35.80 Beam 4R10 /Link R6@150mm/CC
         
5 Skim coat RM 0.45 /fs x 200 90.00 200.00 Cement sand 20mm plaster RM 1.00 x 200
         
6 Concrete infill to beam and Column @ 190/M3     Beam & Column concrete @190.00 per M3
  Column 3.05 6.10 Column
  Beam 5.13 18.25 Beam
         
  Total 504.25 566.95  
         
  Cost Saving Per 100 sf wall 62.70